NASA
GLENN RESEARCH CENTER
ON-SITE
TASK ORDER CONTRACTOR - 2 YEARS
Scope of Work: On-site construction services including HVAC,
gas systems, electrical systems, safety systems, communication systems,
sewer systems, hazard assessment, insulation, painting, demolition
and construction of facilities.
NASA GLENN
RESEARCH CENTER
BUILDING 14, PHASE III
Scope of Work: General Contractor for rehabilitation of 26000
s.f. including demolition and replacement of entire mechanical and
electrical systems. The project included hazardous material abatement,
new roof penetrations, new structural supports for larger air handling
units, new steam and chilled water systems, new electrical and lighting
systems and new fire suppression system. Interior finishes included
new ceiling system, painting and epoxy flooring.
CLEVELAND
HOPKINS AIRPORT
GLYCOL COLLECTIONS SYSTEMS - PHASE 1A
Scope of Work: Construction of an influent control structure,
influent pump wet well, pump control building foundation & building
only, paved runway drainage control, and runway and apron repair.
CITY
OF ELYRIA
SOUTH PARK RECREATION CENTER
Scope of Work: Complete turnkey construction of a 16,000
s.f. recreation center including site work, concrete foundations,
masonry, structural steel, carpentry, aluminum storefronts,
roofing, interior finish work, and paving. Work completed on
time and within budget.
LORAIN
COUNTY METRO PARKS
CARLISLE RESERVATION CENTRAL MAINTENANCE FACILITY
Scope of Work: General Contractor responsible for site
development and building construction of an 18,000 s.f. maintenance
facility including finishes and landscaping. Also managed
and coordinated other prime contractors including electrical,
plumbing and HVAC. Project was completed on time and within
budget.
CITY OF SEVEN HILLS SEVEN HILLS
FIRE STATION NO. 1
Scope of Work: Construction of 10,000 s.f. fire station
in two phases. First, a 6,000 s.f. masonry addition was adjoined
to the existing building. When it was functional, the original
4,000 s.f. building was selectively demolished and rebuilt as
an integral portion of the phase one addition. In this manner,
the project was completed without interrupting the operation
of the only active fire station in Seven Hills.
MACDOWELL
WAREHOUSE, NORTH ROYALTON, OH
Scope of Work: A 9200 s.f. pre-engineered warehouse
with 14000 s.f. of concrete parking lot, drives and walks. This
project included all site work consisting of utilities, storm
retention system and landscaping.
MANOIR
ELECTROALLOYS, ELYRIA, OH
MACHINE SHOP ADDITION (20000 s.f.) & TWO
MACHINERY FOUNDATIONS
Scope of Work: Construction of a 20000 s.f. clear-span
machine shop addition to existing foundry with two foundations
for 22 meter horizontal boring mills, and a 3200 s.f. centrifugal
mold storage building with storage racks and a 5-ton crane.
Both additions were completed simultaneously. The project included
site grading, storm drainage system, and pre-engineered steel
buildings designed and constructed to suit the customer's needs.
Also, a foundry improvement which covered approximately 16000
s.f. for a flaskless mold line. This work consisted of the demolition
and removal of existing floor and foundations; the addition
of a two-story penthouse to accommodate a new silo system; and
a new foundation and floor system including a shaker table pit
and excess removal tunnel, embedded rails, a vibratory conveyor
ramp and silo foundation. This project required heavily reinforced
concrete structures with structural steel embedments.
EASTMAN BUILDING
Scope of Work: Reconstruction and restoration of 1902
Building facade to its original appearance after being damaged
by a fire truck.
EDUCATIONAL SERVICE CTR OF LORAIN COUNTY
LEECA ADDITION/RENOVATION
Scope
of Work: Construction
of a one-story building addition
and interior alterations to existing building.
SBARRO
- THE ITALIAN EATERY
REMODEL AT THE GALLERIA
Scope of Work: Fast track remodeling of restaurant with
a 14-day schedule. This project was completed ahead of schedule
-
in just seven days.
NASA
- GLENN RESEARCH CENTER
BUILDING
14 - PHASE I & PHASE II REHABILITATION AND MODIFICATION OF INDUSTRIAL
WORKSPACE (26000 SF)
Scope of Work: General Contractor for rehabilitation
of 26000 s.f. including demolition and replacement of entire
mechanical and electrical systems. The project included hazardous
material abatement, new roof penetrations, new structural supports
for larger air handling units, new steam and chilled water systems,
new electrical and lighting systems and new fire suppression
system. Interior finishes included new ceiling system, painting
and epoxy flooring.
BUILDING
6 - PHASE I & PHASE II REHABILITATION OF MECHANICAL & ELECTRICAL
SYSTEMS (2-STORY, 30000 SF)
Scope of Work: Complete building rehabilitation including
demolition and replacement of entire mechanical and electrical
systems. The project included hazardous material abatement,
new roof penetrations, new structural supports for larger air
handling units, new steam and chilled water systems, new electrical
and lighting systems and new fire suppression system. Interior
finishes included new ceiling system, painting and carpeting.
The project was completed in two phases to eliminate the disruption
of daily operation.
GARRET
A. MORGAN WATERWORKS, CLEVELAND, OH
Scope of Work: Installation of two chemical feed systems
(Phosphate and Flouride) during improvement efforts.
NASA
- GLENN RESEARCH CENTER
BUILDING 5 - HIGH PRESSURE STEAM PIPE
Scope of Work: Rehabilitation of the high pressure steam
supply system including hazardous material abatement, new expansion
joints and valves, installation of redesigned support system,
and new insulation. Project completed ahead of schedule.
NASA
- PLUMBROOK FACILITY, SANDUSKY, OH
CONCRETE BASEMENT FLOOR & PLAZA DECK REPAIR
Scope of Work: Removed expanded shale in building basement
to depths of 54 inches. Replaced with LSM-100 and new concrete
floor. Removed plaza deck wearing course and rebuilt to owners
specifications including new drainage system.
Project was completed ahead of schedule and well
under budget.
RVM
INDUSTRIES
FOUNDATION
FOR STRETCHER LEVELER CUT TO LENGTH LINE
Scope of Work: Foundation for a 600 ton stretcher leveler
cut to length line (150 l.f.) consisting of 690 cy of concrete,
30 tons of rebar, 150 bolts (ranging from 1" x 18" to 2" x 6'),
eleven elevation changes, and fabricated steel embedments.
LORAIN
METROPOLITAN HOUSING AUTHORITY
ALBRIGHT TERRACE AND PARKING DECK
Scope of Work: General Contractor for the construction
of a 12000 s.f. parking deck. The project included grubbing,
clearing and rough grading; placement of 48 caissons (48"
and 54" in diameter) approximately 32 ft. deep; grade beam
with structural bearing wall; cast-in-place concrete support
piers with anchor rods; precast structural support beams and
hollow-core planking; 4" thick reinforced and bonded overlay;
cast-in-place concrete columns for fence and guard rail system;
new storm drainage system; new asphalt paving for parking lots
approaching both ends of deck; and new concrete curbs and walks.
VACTOR
DUMP FACILITY CITY OF ELYRIA
Scope of Work: Construction of a structural concrete
dump facility at the waste water treatment plant.
EMERALD
CORPORATE PARK
Scope of Work: Installation of CEI electrical utility
service system including 4200 l.f. of trenching and installation
of 4" diameter conduit and 5 vaults. Construction of transformer
and switchgear foundation system including 1200 l.f. of 4"
conduit duct banks.
Installation
of 4200 l.f. power conduit system for CPP including light pole
bases and pull boxes.
V.A.
HOSPITAL
Scope of Work: Disassembled, moved and reconstructed
physical therapy suite.
CLEVELAND
JUVENILE COURT FACILITY
Scope of Work: Installed foundations for transformers,
switch gear and conduit for new power system.